Poland
G11 vs G12 tariff comparison
Compare full annual G11 and G12 electricity bills for your Polish grid operator (PGE, Tauron, Enea, Energa, STOEN).
Open calculatorThe device list gives electricity use per day and per year. The form has energy prices and the operator’s 2026 distribution rates: per kWh, national charges, the fixed fee, the subscription and the capacity charge. You can type rates from your contract or load the Energa-Obrót tariff.
A year at the operator’s net rates for 2026-02-01–2026-12-31. Operator tariff (source)
PGE Dystrybucja · G11 — one price all day
Annual bill, gross (23% VAT)2,081 zł
Use per day: watts ÷ 1000 × hours. Per year: that result × days in the year. A device that is off stays on the list and is left out of the bill.
The link may contain your inputs. Anyone receiving it can read them.
The bill is for 12 months at the 1 Feb–31 Dec 2026 rates. VAT at 23% is added once to the net total. The capacity-charge band comes from this use. Zone hours are in the operator’s tariff. The calculator omits G13, solar self-consumption and reliefs.
Stored strictly in this browser’s local storage. Clicking an entry reloads the parameters into the calculator URL; sharing the link exposes those inputs to the recipient.
No saved calculations yet. Use any calculator and your recent results will appear here.
Educational estimate only. Not medical, tax, legal or financial advice.